Agenda item

P/14/464/OUT - Land east of A4061 (BNDR) Coity - Outline application for 220 dwellings

Minutes:

RESOLVED:              (1) That the applicant enters into a Section 106 Agreement subject to:

 

(i) Provide for 11 units of affordable housing to be transferred to a Registered Social Landlord, with the type of units, location within          the site and affordable tenure to be agreed by the Council.

 

(ii) Provide a financial contribution in accordance with the    Educational Facilities Supplementary Planning Guidance   (SPG)   formula towards the provision of additional nursery and primary school places in the schools serving the development; this figure being dependent on the final development mix and numbers with contributions provided on a pro-rata basis.

 

 

(2) That the Corporate Director – Communities be given plenary powers to issue a decision notice granting outline consent in respect of this proposal once the applicant and A1 Loo Hire has entered into the aforementioned Section 106 Agreement. Subject to the standard outline conditions and the additional conditions contained in the report of the Corporate Director – Communities and following amended conditions 4,11, 12, 13,15,16,17 and 25:

 

4.         The plans and particulars submitted in accordance with the reserved matters for this development shall make provision for public open space in accordance with the North East Brackla Development Brief and in the general locations illustrated on drawing titled: 'Land at Brackla West, Bridgend - Master Plan - Revision A, received on 10 October 2014. No development shall however commence until a detailed scheme including all items of natural play, associated ground works and landscaping has been submitted to and agreed in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the 50th dwelling being occupied on site or in accordance with a timetable to be agreed in writing with the Local Planning Authority.

 

Reason: In the interests of the residential amenities of future occupants

 

11.       No works shall commence on site until such time as a scheme has been submitted to and agreed in writing by the Local Planning Authority for the provision of an active travel route along the Western Boundary/A4061. The link shall be laid out as a 3.5 metre cycleway/footway link set back from the carriageway behind a 1.5m margin strip and shall extend from the existing cycle route provision at the A4061 roundabout at the South Western corner of the site through to the A4061/Heol West Plas Roundabout. Such a scheme shall be implemented, as agreed, in permanent materials before any dwelling on the development is brought into beneficial use or in accordance with a timetable to be agreed in writing with the Local Planning Authority.

 

Reason: In the interests of promoting sustainable travel patterns.

 

12.        No works shall commence on site until such time as a         scheme has been submitted to and agreed in writing by the Local Planning Authority for the provision of cycleway/footway links to the Coity Higher Community Centre and Parc Derwen at the A4061/Heol West Plas roundabout. These links will consist of 3m wide uncontrolled crossing points on the Heol West Plas arm and the A4061/Rotary Way arm. Where a refuge is required on those crossing points these shall be a minimum depth of 2.4m. Such a scheme shall be implemented, as agreed, in permanent materials before any dwelling on the development is brought into beneficial use or in accordance with a timetable to be agreed in writing with the Local Planning Authority.

 

Reason: In the interests of highway safety and promoting sustainable travel patterns.

 

13.       No works shall commence on site until such time as a scheme has been submitted to and agreed in writing by the Local Planning Authority for the provision of cycleway/footway links to Princess Way from the Greater and lesser development parcels. These links will consist of a 3m wide segregated routes with uncontrolled crossing points on the Princess Way/Princess Way link road roundabout. Where a refuge is required on those crossing points these shall be a minimum depth of 2.4m. Such a scheme shall be implemented, as agreed, in permanent materials before any dwelling on the development is brought into beneficial use or in accordance with a timetable to be agreed in writing with the Local Planning Authority.

 

Reason: In the interests of highway safety and promoting sustainable travel patterns.

 

15.       The development shall be served by no less than three individual 3.5 metre wide cycleway/footway links onto the active travel route along the Western site Boundary. These shall be sited at the north western corner of the development, in the vicinity of the public open space at the South Western corner of the site together with one approximately midway between the two. In addition the North Western link shall also incorporate a 2.5m footway to link to the existing footway provision link on Joslin Close. Such a scheme shall be implemented in permanent materials before any dwelling on the development is brought into beneficial use or in accordance with a timetable to be agreed in writing with the Local Planning Authority.

 

Reason: In the interests of promoting sustainable travel   patterns.

 

16.       No works shall commence on the construction of any dwelling until a scheme has been submitted to and agreed in writing by the Local Planning Authority showing the removal of the existing left turn filter lane to the A4061/Princess Way Link Road. The scheme shall include for all appropriate signing and carriageway markings and shall be fully implemented before any dwelling is brought into beneficial use.

 

Reason: In the interests of highway safety.

 

17.        No works shall commence on the construction of any dwelling until a scheme has been submitted to and agreed in writing by the Local Planning Authority showing amended direction signage on route A4061 and Princess Way Link Road. The scheme shall be fully implemented before any dwelling is brought into beneficial use.

 

Reason: In the interests of highway safety.

 

25.        A Landscape and Ecological Management Plan (LEMP) shall be submitted to and agreed in writing by the Local Planning Authority prior to any works commencing on the construction of any dwelling. The LEMP shall include the following:

 

a) Description and evaluation of features to be managed…

 

Code No.              Proposal

 

P/14/464/OUT       Land east of A4061 (BNDR) Coity - Outline application for 220 dwellings

 

 

 

 

 

 

Supporting documents: